(1) Preexisting entry porch |
|
(2)
Ripout, and work in progress |
|
(3)
Completion
The foundation, vent panels, and railing were all designed to appear as extensions of the original construction. |
|
(4)
Work in progress
The cement block foundation rests on a continuous reinforced concrete footing. Framing lumber is pressure treated for rot resistance. |
|
(5)
Construction details
Railing components have been pre-coated prior to assembly. The ipe (“iron wood”) deck is attached with blind fasteners. |
|
(6)
Hooded low voltage post lights, observable below the hand rail, provide illumination. |