|
(4)
Work in progress
Framing lumber is pressure treated for rot resistance. |
|
(5)
The ipe (“iron wood”) decking was attached with blind fasteners. |
|
(6) Deck finishing
The decking was first sanded, and then saturated with multiple coats of preservative oil. |
|
(7)
Finished deck walking surface. |
|
(8)
Railing construction
All components were precoated. Assembled sections were then installed, seams caulked, and final finish coatings applied. |
|
(9)
Completion
The rail cap material also is ipe. |